Current Lead Times

Updated on: 7/21/08

Please read the instuctions that were sent out about the European Supplier Shutdown Schedule.

Category

Lead Time

Brayton Healthcare Models

 

Brayton Healthcare Wood

4 weeks All orders for Torus and St Clair must be submitted to Scheduling.

Executive

 

All Executive Models

4 weeks

Fast Track

 

Fast Track

15 working days

Lounge

 

All Lounge Models

4-6 weeks

Await with LED Lighting

6 weeks

Lounge Sofa

4-6 weeks

Switch

19 weeks for 391 Switch

Masters Collection

 

OOM

5-6 weeks Submit each order to Scheduling to check avail of parts

Metal Side Seating

 

All Metal Seating Models

6 weeks

Capa

1810 with polished frames, submit to scheduling to check avail of parts

Switch

1500 and 1510 with matte finish Submit to Scheduling

Switch Barstools

1405 with matte frames Submit to Scheduling to check avail of parts

Tables

 

All Tables/Options

6 weeks

Await benches with LED package

6 weeks

Circa tables

6 weeks

Diekman

6 weeks

Donovan/Ginger

6 weeks

Glass/Granite Top Options on Tables

6 weeks

Laminate Option on tables

6 weeks

Sidewalk

7 weeks

Switch tables

6 weeks

Trees (Metal)

8-10 weeks

Trees (SensiTile)

6 weeks

Trees (Wood or painted)

6 weeks

Wood Guest Side Chairs

 

All Hannah chairs (Discontinued)

Submit all Hannah orders to Scheduling to check availability of parts

All Peek chairs and barstools

8 weeks Orders with W-10 finish or very light finish must be submitted to Scheduling to check availability of frames

All Peek chairs and barstools with perforated backs

8 weeks

All Wood/Guest Models

6 weeks

Kathryn 2540-1 and 2547-1

Submit all orders to Scheduling to check avail of parts

 



How to avoid Impacting Your Lead Time:
1. Make sure your order is complete (Ex: Finish Selections, Textile Details, Model Numbers, Contract Numbers, etc.)  2. Remember, Certain Textiles or Textile Enhancements Require Longer Lead Times (Ex: Pique, Perforated, Embossed, some NovaSuedes, Latex Backing, Teflon, or GORE SP.)  3. Remember to Include Your Custom Quote Number for Custom Product. 4. Be Sure to Send in Your Sketches for Contrasting Upholstery. 5. Project Your Critical or Large Volume Orders with Your Project Manager or Customer Service.

All quoted lead times are subject to change based on issues that could arise relating to availability of parts and large quantities on orders.

Lead times could be effected by the European shutdown schedule and holiday schedules from other vendors.