Updated on: 7/21/08
Please read the instuctions that were sent out about the European Supplier Shutdown Schedule.
Category |
Lead Time |
Brayton Healthcare Models |
|
Brayton Healthcare Wood |
4 weeks All orders for Torus and St Clair must be submitted to Scheduling. |
Executive |
|
All Executive Models |
4 weeks |
Fast Track |
|
Fast Track |
15 working days |
Lounge |
|
All Lounge Models |
4-6 weeks |
Await with LED Lighting |
6 weeks |
Lounge Sofa |
4-6 weeks |
Switch |
19 weeks for 391 Switch |
Masters Collection |
|
OOM |
5-6 weeks Submit each order to Scheduling to check avail of parts |
Metal Side Seating |
|
All Metal Seating Models |
6 weeks |
Capa |
1810 with polished frames, submit to scheduling to check avail of parts |
Switch |
1500 and 1510 with matte finish Submit to Scheduling |
Switch Barstools |
1405 with matte frames Submit to Scheduling to check avail of parts |
Tables |
|
All Tables/Options |
6 weeks |
Await benches with LED package |
6 weeks |
Circa tables |
6 weeks |
Diekman |
6 weeks |
Donovan/Ginger |
6 weeks |
Glass/Granite Top Options on Tables |
6 weeks |
Laminate Option on tables |
6 weeks |
Sidewalk |
7 weeks |
Switch tables |
6 weeks |
Trees (Metal) |
8-10 weeks |
Trees (SensiTile) |
6 weeks |
Trees (Wood or painted) |
6 weeks |
Wood Guest Side Chairs |
|
All Hannah chairs (Discontinued) |
Submit all Hannah orders to Scheduling to check availability of parts |
All Peek chairs and barstools |
8 weeks Orders with W-10 finish or very light finish must be submitted to Scheduling to check availability of frames |
All Peek chairs and barstools with perforated backs |
8 weeks |
All Wood/Guest Models |
6 weeks |
Kathryn 2540-1 and 2547-1 |
Submit all orders to Scheduling to check avail of parts |
How
to avoid Impacting Your Lead Time: 1. Make sure your order is complete (Ex:
Finish Selections, Textile Details, Model Numbers, Contract
Numbers, etc.) 2. Remember, Certain Textiles or Textile
Enhancements Require Longer Lead Times (Ex: Pique, Perforated,
Embossed, some NovaSuedes, Latex Backing, Teflon, or GORE
SP.) 3. Remember to Include Your Custom Quote Number for
Custom Product. 4. Be Sure to Send in Your Sketches for
Contrasting Upholstery. 5. Project Your Critical or Large
Volume Orders with Your Project Manager or Customer Service.
All quoted lead times
are subject to change based on issues that could arise
relating to availability of parts and large quantities
on orders.
Lead times could be effected by
the European shutdown schedule and holiday schedules from other vendors.